The kitchen is next. Take a look at the ceiling - You can see where holes have been patched and where the lights are ready for install.
|
|
A detail of one of the kitchen ceiling patches. We're going to put ceiling tiles in the kitchen, so we probably won't put a finishing coat on these patches.
|
|
We've completed the texturing and preliminary preparation of the hallway and stairwell walls. Using our hands, we feathered a light texture into the walls.
|
|
A bit of detail - you can see the texture a bit, as well as the new-found whiteness.
|
|
Up in the bathroom, the walls have received their finish coat of spackle and are ready for priming. You can see the wallpaper scraping in-progress on the ceiling.
|
|
Poop Nook Realized.
|
|
A better view of the bathroom walls. We finish scraping, we prime, we paint, we apply a countertop.
|
|
The sink area - nearly ready for it's countertop. The second sink is on backorder and should be in May 31.
|
|
Cleanup.
|
|
The old electrical box. Four screw-in fuses. State of the art 1913.
|
|
The new electrical panel. 150amp service to the house. Brand new wiring from the pole to the outlet. ZzzzzzzzzZAP!
|
|
Coming Soon - We tile the entrance hallway, sand the floors and clean and paint the floor grate.
|
|
Won't you be, my neighbor?
The neighbor finally voiced his concerns about being bitten/attacked by Riley. Does THIS look like the face of a killer?
|