The House - Putting it all together
..and so the rebuild begins

House Index
Previous Step Next Step
The kitchen is next. Take a look at the ceiling - You can see where holes have been patched and where the lights are ready for install.
A detail of one of the kitchen ceiling patches. We're going to put ceiling tiles in the kitchen, so we probably won't put a finishing coat on these patches.
We've completed the texturing and preliminary preparation of the hallway and stairwell walls. Using our hands, we feathered a light texture into the walls.
A bit of detail - you can see the texture a bit, as well as the new-found whiteness.
Up in the bathroom, the walls have received their finish coat of spackle and are ready for priming. You can see the wallpaper scraping in-progress on the ceiling.
Poop Nook Realized.
A better view of the bathroom walls. We finish scraping, we prime, we paint, we apply a countertop.
The sink area - nearly ready for it's countertop. The second sink is on backorder and should be in May 31.
Cleanup.
The old electrical box. Four screw-in fuses. State of the art 1913.
The new electrical panel. 150amp service to the house. Brand new wiring from the pole to the outlet. ZzzzzzzzzZAP!
Coming Soon - We tile the entrance hallway, sand the floors and clean and paint the floor grate.
Won't you be, my neighbor?
The neighbor finally voiced his concerns about being bitten/attacked by Riley. Does THIS look like the face of a killer?
Previous Step Next Step